Highelectricitybill?

Littletime?

Advice Implementation needed?

Many businesses work with good electrical contractors. Complex control, forecasting and energy trading, however, are not the core business on either side. We fill that gap.

From the field

Problems we see every day

PV too optimistic and oversized

Nobody looked at the load profile or at realistic feed-in rates.

−€30,000 over ten years

Wallboxes without control

Every car charges whenever it likes. Right at the peak.

−€12,000 per year

Expensive tariffs

The devil is in the details: grid fees and power purchasing.

−€10,000 per year

Storage that fails noise and fire regulations

The authority demands retrofitting.

−€20,000 over ten years

Bought, but rarely checked

A control system against expensive load peaks – inactive for years. Nobody noticed.

−€6,000 per year
Cost: −330.000 € Example of one site, over ten years.

Annoying on their own. Expensive together.

And easily avoided with one coordinated approach.

Our approach

Three principles we work by

  1. You hand over the topic of electricity — and never have to think about it again

    You can still decide how closely you want to be involved.

  2. The most economical measures first

    We start where a euro does the most — usually the tariff and the grid fees, not a new purchase. Investment comes only once every other option is exhausted.

  3. We earn on savings, not on hardware

    Learn more

    Our fee is a share of what you actually save. We don't sell equipment on commission — if it doesn't pay for itself, we don't recommend it. And if nothing pays off, you pay nothing.

The offer

How we work together

You save. We take care of the rest.

22,500 W Meter 1
Kitchen
16,342 W Meter 2
Wellness
6,542 W Meter 3
Ventilation
Our metering hardware
We record your grid connection and the main loads in 15-minute intervals: kitchen, wellness, ventilation, refrigeration, heating.
After 30 days you get a compact report: what drives your electricity costs, what each load costs you per year and where the biggest savings potential lies.
Cost: the metering is free. The metering hardware stays our property, installation included. If you decide not to take a next step, we collect the metering hardware again.

Most sites pay more than necessary on grid fees and electricity tariffs. We fix that first.

We review your grid fees and your energy tariffs for avoidable costs.
We connect storage, wallboxes and PV systems you already have to our control. Most of them run on factory settings and leave a large part of their benefit unused.
Fee: a share of the proven savings in the first year. No savings, no invoice.

Buying is quick. Sizing it properly and keeping it optimised is rare.

Whether storage, PV or charge points is decided by your data and how your business runs. We size the system around your operation and handle the paperwork.
We handle the implementation together with regional specialist firms — the decisions stay with you.
Each month our controller calculates which load peak is economically optimal for your site, keeps it reliably, and switches on controllable loads accordingly.
Fee: monthly, tied to the savings our controller secures for you.

The system keeps running. We keep an eye on it, even when you don’t.

Monthly short report: load peak, savings, anything unusual.
Training for your building technicians so your team understands what the system does and why.
On request we add sauna, ventilation or cold rooms to the control, if the data shows it pays off.
For sites on a district heating network: a lower return temperature and therefore better contract terms, simply by setting up your heating system correctly.
How it fits together

Every solution. One contact.

We combine the best manufacturer in each area into one optimal overall solution — and make it intelligent with our own controller. And we work hand in hand with your electrical contractor.

Control
Solar
Heat pump
Charge points
Sauna
Battery storage
Metering & grid
Who it's for

Profitability through specialisation

We don't do everything for everyone. To reduce the costs caused by load peaks, we have to know your operation in detail — load profiles, busy hours, daily workflow. That's why we stay deliberately focused. If we take it on, we do it properly.

References

Results that last

Heizwerk Heiligenblut

Biomass heating plant · 80 MWh / year

Measures: reduced grid fees, tariff switch

Savings year 1 -41 %
Before
€ 20,200 / year
With Z'AM Business
€ 11,900 / year

Heizwerk Rennweg

Biomass heating plant · 40 MWh / year

Measures: reduced grid fees, control of existing wallboxes, tariff switch

Savings year 1 -37 %
Before
€ 11,200 / year
With Z'AM Business
€ 7,100 / year

First analysis — free and instant.

We take a look at your current electricity use and tell you what's actually possible at your site. Honest. No strings attached. You get first results right away.

Request first analysis